Investigation Circle, NWDA, Bhubaneswar |
|
Works Entrusted with SE(Bhubaneswar), NWDA |
|
1. |
System Study |
The study of various Possible Scenarios for understanding the long term effect of irrigation coming in the enroute of the proposed Mahanadi-Godavari Link Project |
|
2. |
Preparation of Feasibility Report |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. |
Preparation of Pre-Feasibility Report |
|
|
|
|
|
|
4. |
Revision of Water Balance Study |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
viii) Ajoy Sub-Basin upto G-D-S Link Crossing & upto Confluence of Ganga |
|