Investigation Division, NWDA, Jhansi

Works Entrusted with EE(Jhansi ), NWDA

1.

Preparation of Detailed Project Report

 

Ken-Betwa Link Project

Post DPR Activities

  1. Liaison work with State Govts. related to various works.

  1. Sample Command area survey of about 4000 ha survey in Mahoba district of UP.

  1. Topographical survey of additional tanks/barrages for storing monsoon water in UP using Drone/DGPS technology.

  1. Laboratory test of rock and sand for construction material of New Identified Quarries of K-B link project Phase-I by CSMRS.

  1. Design and Cost Estimate of 32 km long syphon duct for alternate alignment

  1. Modification of Comprehensive report after signing of MoU on water sharing between Govt. of UP and MP.

  1. Revised estimate for various activities of K-B link project.

2.

Revision of Water Balance Study Report

 
  1. Lower Betwa Sub-basin