Top Top
  Home    ||    Events   ||    Notices & Tenders    ||    Discussion Forum    ||    Photogallery    ||    Query    ||   ||    Contact Us  
WEBSITE NAVIGATOR

Printable Version

Par-Tapi-Narmada Link

 

The Proposal: NWDA has completed the feasibility study of the link canal project. This link proposes to transfer surpluses available between Par and Tapi to water deficit areas in north Gujarat.  It will transfer 1,350 Mcum of water through a canal of length 401 km. by gravity.  The total enroute irrigation benefits envisaged are 1.63 lakh hectares in Gujarat by utilizing 460 Mcum and 190 Mcum for meeting the transmission losses. In addition to this, about 700 Mcum will also be provided to Saurashtra and Kutch areas of Gujarat. Besides this, there is also a provision for generation of about 32.5 MW of power.                    

Engineering Aspect: The link project consists of 7 proposed reservoirs viz. Jheri, Mohankavchali & Paikhed on Par River, Chasmandva on Auranga River, Chikkar & Dabdar on Ambica River and Kelwan on Purna river and a 401 km long link canal connecting these reservoirs. Powerhouses are proposed at the foot of the dams at Jheri, Paikhed, Chasmandva and Chikkar.  The total length of the link canal is sub-divided into two reaches viz. Par-Tapi (211 km including 5.5 km. tunnel and 33.3 Km. Feeder length), and Tapi - Narmada (190.1 km).  The link from Par to Tapi starts with a tunnel connecting Mohankavchali reservoir to Paikhed weir.  The open channel link starts from Paikhed weir and drops into Ukai reservoir.  The Tapi-Narmada portion of the link starts from Ukai reservoir crosses Narmada River and terminates at the Miyagam branch canal of Narmada main canal.  

Environmental Issue: The seven proposed reservoirs in this link would submerge an area of 7,559 ha of which 3,572 ha is forestland.  Apart from this, 14,832 people and 9,029 livestock would be affected by the submergence.  Provisions have been made to resettle the affected persons by providing them with attractive packages.  Provision has also been made for compensatory afforestation.          

Index Map

--------------------------------------------------------------
  Related Links     ||   Glossary   ||   Newsletter   ||   Disclaimer
--------------------------------------------------------------