v Executive Summary
v Index Map
v Salient Features
v Introduction
v Physical Features
v Interstate Aspects
v Surveys and Investigations
v Hydrology
v Structure and Layout
v Reservoir
v Irrigation Planning
v Command Area Development
v Power
v Construction Programme, Manpower and Plant Planning
v Estimates
v Environmental and Ecological Aspects of the Project
v Abbreviations
v Benefit Cost Ratio
*(The Feasibility Report of Polavaram – Vijayawada Link was circulated in 1999).
http://www.adobe.com/products/acrobat/readstep.html